Team accelerates change through ‘Agile’ deployment
Sticky notes are affixed to a wall Nov. 29, 2021, at an undisclosed location. The 332nd Expeditionary Communications Squadron engineering and installation team implemented the Agile methodology to fast-track package processing. (U.S. Air Force photo illustration by Master Sgt. Traci Keller) (This image was created using high dynamic range techniques.)
PHOTO BY:
MSgt Traci Keller
VIRIN:
211129-F-UE898-1001.JPG
FULL SIZE:
19.2 MB
CAMERA
NIKON Z 7
LENS
24.0-70.0 mm f/2.8
APERTURE
28/10
SHUTTERSPEED
1/125
ISO
2000
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.