Engineering and Installation team tackles communication lines
Members of the U.S. Air Forces Central, Air Force Forces A67 Engineering and Installation team lower equipment into a communications maintenance hole at Ali Al Salem Air Base, Kuwait, Oct. 19, 2021. The A67 E&I team is entrusted to install and engineer new communications system for different mission requirements, as well as relocate and remove old or obsolete systems to improve the installation. (U.S. Air Force Photo by Tech. Sgt. Daryn Murphy)
PHOTO BY:
Tech. Sgt. Daryn Murphy
VIRIN:
211019-F-RW874-1034.JPG
FULL SIZE:
2.6 MB
CAMERA
NIKON Z 6
LENS
NIKKOR Z 24-70mm f/2.8 S
APERTURE
28/10
SHUTTERSPEED
1/1600
ISO
100
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.