Engineering and Installations team keeps the BAF missions running
Texas Air National Guard Staff Sgt. Melissa Dundon, left, and Staff Sgt. Peter Del Bosque, 455th Expeditionary Communications Squadron cable and antenna systems installers, cut a piece of fiber cable July 8, 2015, at Bagram Airfield, Afghanistan. The engineering and installations team is responsible for installing fiber and copper cables throughout the base that impact flying missions and network systems, including NATO communications. (U.S. Air Force photo by Senior Airman Cierra Presentado/Released)