Bagram civil engineer team keeps airpower going with airfield repairs
Staff Sgt. Richard Bonham, left, and Staff Sgt. Ranson Holt, both from the 455th Expeditionary Civil Engineer Squadron, scoop cement delivered by a contractor to repair a section of the flightline at Bagram Airfield, Afghanistan, Dec. 7, 2015. Airfield integrity concerns are reviewed twice a month by Airfield Management and 455th ECES. Once repairs are completed, these areas of the flightline should not require maintenance for up to 10 years. (U.S. Air Force photo by Tech. Sgt. Nicholas Rau/Released)